Chennai BRTS was a bus rapid transit system taken up as an integrated part of Circular Corridor Project in India. Beginning at Adyar, the route will cover Saidapet, Jafferkanpet, Ramavaram, Puzhal, Manali, Chennai Central Railway Station, Lighthouse and will return to Adyar. The corridor will cover a distance of 70.3 kilometres (43.7 mi). The route of the elevated BRTS corridor was planned to run along the banks of Adyar river and Buckingham canal. The project was expected to be completed by 2013.

Property Value
dbo:abstract
  • Chennai BRTS was a bus rapid transit system taken up as an integrated part of Circular Corridor Project in India. Beginning at Adyar, the route will cover Saidapet, Jafferkanpet, Ramavaram, Puzhal, Manali, Chennai Central Railway Station, Lighthouse and will return to Adyar. The corridor will cover a distance of 70.3 kilometres (43.7 mi). The route of the elevated BRTS corridor was planned to run along the banks of Adyar river and Buckingham canal. The project was expected to be completed by 2013. (en)
dbo:location
dbo:numberOfLines
  • 1 (xsd:nonNegativeInteger)
dbo:numberOfStations
  • 21 (xsd:nonNegativeInteger)
dbo:type
dbo:wikiPageID
  • 16963474 (xsd:integer)
dbo:wikiPageLength
  • 8617 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1068624491 (xsd:integer)
dbo:wikiPageWikiLink
dbp:lines
  • 1 (xsd:integer)
dbp:locale
dbp:mapState
  • collapsed (en)
dbp:name
  • Chennai BRTS (en)
dbp:stations
  • 21 (xsd:integer)
dbp:transitType
  • Elevated Bus rapid transit (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Chennai BRTS was a bus rapid transit system taken up as an integrated part of Circular Corridor Project in India. Beginning at Adyar, the route will cover Saidapet, Jafferkanpet, Ramavaram, Puzhal, Manali, Chennai Central Railway Station, Lighthouse and will return to Adyar. The corridor will cover a distance of 70.3 kilometres (43.7 mi). The route of the elevated BRTS corridor was planned to run along the banks of Adyar river and Buckingham canal. The project was expected to be completed by 2013. (en)
rdfs:label
  • Chennai Bus Rapid Transit System (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • (en)
  • Chennai BRTS (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License